• Home
  • Contact
  • Sub Pilot Course
  • Yacht Subs
    • Acrylic 2-9 Person
    • OP-2
    • SM3 - 100
    • RS-2000-2
    • SY-6
    • C-EX-3
    • CQ3 Submersible
  • Tourist Subs
    • SC30/42 Tourist Submarine
    • PS26 Tourist Submarine
    • PS26 Chinese
    • K-50 Tourist Submarine
    • K-50 Chinese
    • S2 Series Submarines
  • TV/Film Production
  • Semi-Subs for Sale
    • SLD Semi- Sub
    • MSS-2 Semi-sub
  • Charter
    • ADS Suits
    • Perry 1201 submarine
  • T-Sub Site Report
  • Famous Submarines
    • Challenger Deep Submarine
    • Trieste Research Sub
    • Ben Franklin Submarine
    • Alvin
    • MIR Submersibles
  • FAQs
  • News
  • Tourist Submarine Description
  • S2 Series Submarines
Submarines for Sale or Charter, New and Used

Tourist Submarine Site Report and Analysis

There is no more important factor in the establishment of a marine leisure project than location. The site, its physical characteristics and general infrastructure, to a large degree determine the success, mediocrity or failure of an endeavor.

The evaluation of a proposed operating location is called a Comprehensive Site Feasibility Study. The study is written after an in depth evaluation consisting of over 300 criteria developed over 18 years of activity in the tourist submarine sector.

Typically the surveyor will spend a minimum of a week at the proposed location, and will spend additional time accessing secondary information sources.

The completed site feasibility study is a detailed discussion of every salient factor that may impact the operation. As an example, for a typical tourist submarine operation ratings are given in each of the following broad categories;

  • Dive Site Quality
  • Operational Location Logistics
  • Dock & Support Equipment Facilities & Integration
  • Passenger Facilities
  • Market Demographics & Capture Ratio
  • Storm Refuge Plan
  • Maintenance & Haul-out Facilities
  • Maritime Law & Environmental Concerns
  • Stability & Long Term Growth Potential
  • Overall Suitability
  • much more
The results of the site survey are summarized in a written multi-page document and can be supported by aerial and underwater video footage. At additional cost we can also produce the results as a high quality video suitable for presentation to investors.

A Comprehensive Site Feasibility Analysis is typically US$15,995 plus expenses. Based on our experience this is the most important document in the process of implementing a tourist submarine operation. The fee could save you, or make you, millions of dollars. Included in the fee will be UVI staff of two on site for ~ 3-5 days. Allow 14 days or longer to process the complete written report.

Picture
Sub find logo
  
                      Underwater Vehicles Inc.   
                            604-224-9100
                 Skype us at "subman-uvi" 
                               or email 

           We look forward to hearing from you.

                                                            CONTACT US        FOR SALE          CHARTER            FILM PRODUCTION          YACHT SUBS
Proudly powered by Weebly

Design by DivTag Themes